The Build Process

Step-by-step walkthrough of how your SaltGrass home is built.

The Build Process

1. Discovery & Design (Weeks 1-4)

Meet with Dylan to discuss your vision. Explore our models or start from scratch. We create 3D designs and finalize specifications.

2. Permitting & Engineering (Weeks 3-8)

Parallel track: permit applications filed while engineering finalizes plans. Most permits approve within 4-6 weeks.

3. Fabrication (Weeks 5-32)

Factory builds your modules. Quality inspections at 50%, 80%, and 100%. You'll receive progress photos throughout.

4. Delivery & Install (Weeks 33-34)

Modules delivered to your site. Installation team assembles and connects all systems in 2-4 weeks. Initial walkthrough and handoff.